Week 6 Update 2017

This week was a crazy week for us!  It’s crunch week which means the days are longer and work is coming to an end.  Because we have a four day weekend, we have all day Monday to finalize the robot design and test drive.  Last Tuesday, the rest of the robot pieces were cut out on the water jet, the edges of the pieces were filed down, and the robot was assembled.  Once that was done, the Programming and Electronics Team wired all the required components together to fit in the robot.  Friday night we were faced with a major design flaw so we gathered together as a team to brainstorm and after some thought we found a solution.  Finally, now, it’s time to start test driving and working towards building the second robot!